welcome,guest
TitleProduct

Double Sided PE Foam Hook Tape

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-08-03 19:38

  • Browse the number:

    93

Send an inquiries

Company Profile

Guangzhou Bo Hong Composites Co. Ltd

By certification [File Integrity]

Contact: trustpoud(Mr.)  

Telephone:

Area: Beijing

Address: Beijing

Website: http://trustpoud.hlzygz.com/

Product details
Model Number: Trustpoud 1010 Brand Name: Trustpound Key Specifications/Special Features: Description: 1010 PE hook tapeRelease material: yellow release paperWeight of release material:120g/m2
Carrier material: PE

Carrier material density:65kg/m3

Carrier material colors: white and black

Adhesive base: excellent rubber base

Tape thickness: 1/1.5mm

Initial tack (J. Dow method, room temp, steel ball number): >22#

180°peel strength (room temp, N/2.54cm): >23N

Holding power (room temp, 2kg, h): >72hours

Tempeature resistance:60 °C

Best application temperature:22-45°C
Shelf life:6 months

Usage: adhesive to mirror, mark, signboard, photo frame with excellent holding power


Application method:clear the oil contamination, dust, water as well as other impurities from surface before application, the surface must be kept clear while you applications, please make it attach to the correct position by once, and make a little pressure, it should not attach to the surface repeatedly
In order to use the best full properties, please wait for 4 hours after you use one side then put the other side to the surface it is better to attach smooth plastic, metal, glass, ceramic not good for powder wall, rough surface


Remark: data the report offers is measured according to the standard method, reference only, the customer need to confirm the applicability of the product, the correct application involves use objects and many technical details, please be cautious to use if no relevant technical personnel, it is better to consult with our company
Shipping Information:
  • FOB Port: China (Mainland)
  • Lead Time: 1 - 30 days
Main Export Markets:
  • Asia
  • Australasia
  • Eastern Europe
  • Mid East/Africa
  • North America
  • Western Europe